Buck / Boost Converter Calculator
Duty cycle, inductor ripple and output ripple for a switching converter.
—
Duty cycle and ripple
The continuous-conduction equations
In CCM the duty cycle sets the conversion ratio:
The inductor ripple current and the resulting output ripple voltage are:
(For boost, and the output ripple is dominated by the load step .) Keep around 20–40% of the load current: too small wastes a bulky inductor, too large pushes the converter toward discontinuous conduction.